Prologis Park 121 Northwest Dr--DR170328
DAILY CONSTRUCTION REPORT
DATE ___03/28/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Overcast
OWNER Prologis
TEMP 75
WIND ESE 15
CONTRACTOR: Mycon
HUMIDITY 71
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Pavecon poured the Northwest Dr. from the existing edge to the stamped area
-I informed Terry that the saw-cuts needed to be through the muddle and the 20’ spacing for the transverse line
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.