Loading...
Prologis Park 121 Northwest Dr--DR170328 DAILY CONSTRUCTION REPORT DATE ___03/28/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Overcast OWNER Prologis TEMP 75 WIND ESE 15 CONTRACTOR: Mycon HUMIDITY 71 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Pavecon poured the Northwest Dr. from the existing edge to the stamped area -I informed Terry that the saw-cuts needed to be through the muddle and the 20’ spacing for the transverse line SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.