Prologis Park 121 Northwest Dr--DR170329
DAILY CONSTRUCTION REPORT
DATE ___03/29/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER Prologis
TEMP 75
CONTRACTOR: Mycon
WIND SW 21
46
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Pavecon and CalHar are working on locating the valve in the Subaru drive
-CalHar located the valve, I had a picture of the valve for the contractor to work off
-Informed the Forman from Pavecon that the header needed to be in according to the details.
-I let them know that if they wanted to deviate from the details, they needed to submit a formal request
SIGNATURE
PUBLIC WORKS INSPECTOR