Loading...
Prologis Park 121 Northwest Dr--DR170329 DAILY CONSTRUCTION REPORT DATE ___03/29/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER Prologis TEMP 75 CONTRACTOR: Mycon WIND SW 21 46 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Pavecon and CalHar are working on locating the valve in the Subaru drive -CalHar located the valve, I had a picture of the valve for the contractor to work off -Informed the Forman from Pavecon that the header needed to be in according to the details. -I let them know that if they wanted to deviate from the details, they needed to submit a formal request SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.