CONSTRUCTION ACTIVITIES:
-I met with Josue from CalHar about the meter
-I spoke with Jerry Davis from the Water Department about the removing the valve because there were so many. Jerry said it was ok to remove the
valve
-Pavecon is working on the header that connects to Freeport North
-Pavecon will finish tamping the foundation of the Subaru fire lane