Prologis Park 121 Northwest Dr--DR170330 DAILY CONSTRUCTION REPORT DATE ___03/30/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER Prologis TEMP 63 CONTRACTOR: Mycon WIND WNW 17 46 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I met with Josue from CalHar about the meter -I spoke with Jerry Davis from the Water Department about the removing the valve because there were so many. Jerry said it was ok to remove the valve -Pavecon is working on the header that connects to Freeport North -Pavecon will finish tamping the foundation of the Subaru fire lane SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.