Prologis Park 121 Northwest Dr--DR170330 (2)
DAILY CONSTRUCTION REPORT
DATE ___03/30/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER Prologis
TEMP 80
CONTRACTOR: Mycon
WIND S 28
43
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I inspected the steel for Northwest Dr. South
-I informed the contractor that the vertical rebar can not be used for chairs in the roadway
-The contractor plans to pour on Monday
-Pavecon poured the entrance to the Northwest Dr. North at Freeport and the fire lane to Subaru
-I informed Chance, the GC from Mycon that I haven’t received any lab reports for the subgrade on Northwest Dr.
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.