Loading...
PA1501B-CS170413 DAILY CONSTRUCTION REPORT DATE ___04/13/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER CITY of COPPELL TEMP 82 CONTRACTOR: CORE WIND S 14 HUMIDITY 58 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -The contractor is still working on the landscaping East -The contractor is still working on the east -CORE is grading -Wright construction is working on the tap behind the CORE -The plumber are uncovering the the pipes and the meter for inspection -CORE is working on the pavilion on the north side of the property SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.