PA1501B-CS170413
DAILY CONSTRUCTION REPORT
DATE ___04/13/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 82
CONTRACTOR: CORE
WIND S 14
HUMIDITY 58
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
-The contractor is still working on the landscaping
East
-The contractor is still working on the east
-CORE is grading
-Wright construction is working on the tap behind the CORE
-The plumber are uncovering the the pipes and the meter for inspection
-CORE is working on the pavilion on the north side of the property
SIGNATURE
PUBLIC WORKS INSPECTOR