DAILY CONSTRUCTION REPORT
DATE ___04/14/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Scattered
Clouds
OWNER CITY of COPPELL
TEMP 78
CONTRACTOR: CORE
WIND SSE 22
56
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
-The contractor is still working on the landscaping
East
-CORE is still working on the north pavilion
-I met with the plumber to discuss the soder on the pipe past the meter. We informed the plumber that it was ok past the meter and not in the meter
box
-CORE is still grading on the property
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.