Loading...
PA1501B-CS170330 DAILY CONSTRUCTION REPORT DATE ___03/30/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER CITY of COPPELL TEMP 63 CONTRACTOR: CORE WIND WNW 19 46 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -Lane striper are installing the lanes and the handicap lines -The concrete wheel stops are being installed -I informed Robert that the we needed to inspect the flappers on the storm drain manholes East -CORE is still working on the pavilions roofs and brick siding -CORE is still working on the bridge SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.