PA1501B-CS170330
DAILY CONSTRUCTION REPORT
DATE ___03/30/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER CITY of COPPELL
TEMP 63
CONTRACTOR: CORE
WIND WNW 19
46
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
-Lane striper are installing the lanes and the handicap lines
-The concrete wheel stops are being installed
-I informed Robert that the we needed to inspect the flappers on the storm drain manholes
East
-CORE is still working on the pavilions roofs and brick siding
-CORE is still working on the bridge
SIGNATURE
PUBLIC WORKS INSPECTOR