PA1501B-CS170331
DAILY CONSTRUCTION REPORT
DATE ___03/31/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER CITY of COPPELL
TEMP 80
CONTRACTOR: CORE
WIND S 28
43
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
-We performed a final walk-thru
-Everything was completed by the end of the day, except for one marking on the curb for the manhole
-I checked the flapper for the storm drain
East
-CORE is still working on the pavilions roofs and brick siding
-CORE is still working on the bridge
I informed the plumber that the we could not use pipe glue or soder the pipe on the copper
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.