PA1501B-CS170403 DAILY CONSTRUCTION REPORT DATE ___04/03/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Sunny OWNER CITY of COPPELL TEMP 72 WIND SW 4 CONTRACTOR: CORE HUMIDITY 48 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -The striping crew is installing the fire lane paint -Tim Oats said that it was ok for the paint to not be on the Eastcurb -CORE is still working on the pavilions roofs and brick siding -CORE is still working on the bridge -I informed the plumber that the we could not use pipe glue or soder the pipe on the copper SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.