PA1501B-CS170404 DAILY CONSTRUCTION REPORT DATE ___04/04/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER CITY of COPPELL TEMP 85 CONTRACTOR: CORE WIND S. 27 HUMIDITY 32 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -I spoke to Tim Oats about the markings on the pavement -Tim informed me that the paint should have been painted on the curb, but if it’s not, it was ok East -CORE is still working on the pavilions roofs and brick siding -CORE is still working on the bridge -The plumbers is still working on the water meter around the park and for the pavilions SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.