PA1501B-CS170404
DAILY CONSTRUCTION REPORT
DATE ___04/04/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 85
CONTRACTOR: CORE
WIND S. 27
HUMIDITY 32
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
-I spoke to Tim Oats about the markings on the pavement
-Tim informed me that the paint should have been painted on the curb, but if it’s not, it was ok
East
-CORE is still working on the pavilions roofs and brick siding
-CORE is still working on the bridge
-The plumbers is still working on the water meter around the park and for the pavilions
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________