Loading...
PA1501B-CS170406 DAILY CONSTRUCTION REPORT DATE ___04/06/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Sunny OWNER CITY of COPPELL TEMP 75 WIND W. 5 CONTRACTOR: CORE 18 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -CORE is still working on the irrigation for the west side of the property -CORE is still working on the last clean-up for the opening -The grass is not catching so CORE might need to lay down sod or use another type of grass East -CORE is still working on the pavilions roofs and brick siding -The bridges are still being worked on SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.