Loading...
PA1501B-CS170407 DAILY CONSTRUCTION REPORT DATE ___04/07/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Scattered Clouds OWNER CITY of COPPELL TEMP 75 CONTRACTOR: CORE WIND S. 14 36% HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -The landscapers are installing sod because the hydro-mulch is not catching -CORE will start removing the fence on Saturday -The park is still scheduled to be opened on Monday East -We located the 8” water line that is going around The Core -We reviewed the landscaping plans to ensure that piping is being installed in the right location -The contractor is still working on the pavilions -The contractor is grading the property for landscapping SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.