CRDC1401-DR170412
DAILY CONSTRUCTION REPORT
DATE ___04/12/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 74
CONTRACTOR: Pavecon
WIND ESE 12
HUMIDITY 64
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I performed another walk-thru of part of the landscaping starting at Beltline to Bethel
-I have a few items that need to be addressed.
-I will attempt to finish the wak-thru tomorrow
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.