DAILY CONSTRUCTION REPORT
DATE ___04/13/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 82
CONTRACTOR: Pavecon
WIND S. 14
58
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I informed Michael B. from Pavecon that the change order was accepted
-Michael informed me that he would inform AALC so they can order all of the material
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.