CRDC1401-DR170414
DAILY CONSTRUCTION REPORT
DATE ___04/14/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Scattered
Clouds
OWNER CITY of COPPELL
TEMP 78
CONTRACTOR: Pavecon
WIND SSE 22
56
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I spoke to an employee at 123 Sandy Lake. I informed the owner that I would speak to the contractor about the irrigation being shut-off
-I texted Michael B. from Pavecon about the issue and he informed me that he forgot and that he would take care of it on Monday