Loading...
CRDC1401-DR170414 DAILY CONSTRUCTION REPORT DATE ___04/14/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Scattered Clouds OWNER CITY of COPPELL TEMP 78 CONTRACTOR: Pavecon WIND SSE 22 56 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I spoke to an employee at 123 Sandy Lake. I informed the owner that I would speak to the contractor about the irrigation being shut-off -I texted Michael B. from Pavecon about the issue and he informed me that he forgot and that he would take care of it on Monday SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.