CRDC1401-DR170403
DAILY CONSTRUCTION REPORT
DATE ___04/03/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Sunny
OWNER CITY of COPPELL
TEMP 72
WIND SW 4
CONTRACTOR: Pavecon
HUMIDITY 48
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I text Michael B. from Pavecon about the street name lights.
-He informed me that a crew would be onsite today to work on the lights
-If the lights are not finished, Mr. George say we will repair it and bill it to Pavecon
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.