Loading...
CRDC1401-DR170404 DAILY CONSTRUCTION REPORT DATE ___04/04/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER CITY of COPPELL TEMP 85 CONTRACTOR: Pavecon WIND S. 27 HUMIDITY 32 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I took pictures of all of the damaged landscaping -I spoke to John Elias to ask if he had any pictures and he informed me that they didn’t take any pictures and that most of the landscaping was repaired since the walk through -I reminded Mike that the street name signs needed to be removed SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.