CRDC1401-DR170405
DAILY CONSTRUCTION REPORT
DATE ___04/05/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Scattered
Cloudy
OWNER CITY of COPPELL
TEMP 70
CONTRACTOR: Pavecon
WIND NW 28
HUMIDITY 30
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-We had a meeting for the Denton Tap/Sandy Lake Project
-Pavecon said the Street name lights will be turned on by Friday
-Michael B. re-did the change order
-I informed Michael that they have dirt in the median
SIGNATURE
PUBLIC WORKS INSPECTOR