Loading...
CRDC1401-DR170405 DAILY CONSTRUCTION REPORT DATE ___04/05/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Scattered Cloudy OWNER CITY of COPPELL TEMP 70 CONTRACTOR: Pavecon WIND NW 28 HUMIDITY 30 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -We had a meeting for the Denton Tap/Sandy Lake Project -Pavecon said the Street name lights will be turned on by Friday -Michael B. re-did the change order -I informed Michael that they have dirt in the median SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.