Loading...
CRDC1401-DR170406 DAILY CONSTRUCTION REPORT DATE ___04/06/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER CITY of COPPELL TEMP 74 CONTRACTOR: Pavecon WIND NW 6 30 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I informed Michael B. that the large pipe was still at 123 E. Sandy Lake -The lights are working over the street signs now -Michael said that he will take care of the dirt pile in the road SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.