CRDC1401-DR170407
DAILY CONSTRUCTION REPORT
DATE ___04/07/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly Scattered
Cloudy Clouds
OWNER CITY of COPPELL
TEMP 74 75
CONTRACTOR: Pavecon
WIND NW 6 S. 14
30 36
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-AALC came on site and removed the 2 pipes that were still on the owners property
-Monday, Michael B. will be onsite to discuss the irrigation being shut off and investigate whether it was damaged or not
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.