Loading...
CRDC1401-DR170407 DAILY CONSTRUCTION REPORT DATE ___04/07/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Partly Scattered Cloudy Clouds OWNER CITY of COPPELL TEMP 74 75 CONTRACTOR: Pavecon WIND NW 6 S. 14 30 36 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -AALC came on site and removed the 2 pipes that were still on the owners property -Monday, Michael B. will be onsite to discuss the irrigation being shut off and investigate whether it was damaged or not SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.