CRDC1401-DR170327
DAILY CONSTRUCTION REPORT
DATE ___03/27/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 65
CONTRACTOR: CORE
WIND N 9
HUMIDITY 65
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Landscapers are still working on the W. Sandy Lake
-ATCI still has not fixed the lights over the street signs.
-The contractor is working on the ridged pipe that goes under the bridge on Denton Tap
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.