Loading...
CRDC1401-DR170330 DAILY CONSTRUCTION REPORT DATE ___03/30/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER CITY of COPPELL TEMP 63 CONTRACTOR: Pavecon WIND WNW 17 46 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I checked the pipe under the bridge -Pavecon start removing the plastic on the expansion joints and sealing them -AALC is still working on the landscaping SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.