Loading...
CRDC1401-DR170320 DAILY CONSTRUCTION REPORT DATE ___03/20/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Sunny OWNER CITY of COPPELL TEMP 86 WIND S. 19 CONTRACTOR: CORE HUMIDITY 35 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -AALC is working on the landscaping on W. Sandy Lake -The electrical pole in front of Frost Bank has been removed -The lights on the monuments work on a generator. The electrical contractor still hasn’t connected the monument yet. -Michael Bettie will contact ATCI about making sure the connection is made SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.