CONSTRUCTION ACTIVITIES:
-AALC is working on the landscaping on W. Sandy Lake
-The electrical pole in front of Frost Bank has been removed
-The lights on the monuments work on a generator. The electrical contractor still hasn’t connected the monument yet.
-Michael Bettie will contact ATCI about making sure the connection is made