CRDC1401-DR170322
DAILY CONSTRUCTION REPORT
DATE ___03/22/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 81
CONTRACTOR: CORE
WIND SSW 13
HUMIDITY 57%
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-AALC is working on the landscaping for the W. Sandy Lake
-The sidewalk in front of Frost Bank will be poured on Monday
-We discussed the landscaping
-Pavecon will contact the electrical contractor about the fiber and the missing conduit
-We will have a project clean-up next week
-The inlet protection in front of Chipotles will be pulled next week
There will be another meeting next week
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.