CRDC1401-DR170227
DAILY CONSTRUCTION REPORT
DATE ___02/27/2017__________ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER CITY of COPPELL
TEMP 75
WIND S 15
CONTRACTOR: CORE
HUMIDITY 67
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
No work is being performed today because of the poor weather
Pavecon is saying that the electrical won’t fit inside of the monuments and needs to be pushed outside the brick.
We will have a meeting to discuss the change in the monuments
The pavement repair is still scheduled to take place during spring break