Loading...
CRDC1401-DR170227 DAILY CONSTRUCTION REPORT DATE ___02/27/2017__________ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER CITY of COPPELL TEMP 75 WIND S 15 CONTRACTOR: CORE HUMIDITY 67 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: No work is being performed today because of the poor weather Pavecon is saying that the electrical won’t fit inside of the monuments and needs to be pushed outside the brick. We will have a meeting to discuss the change in the monuments The pavement repair is still scheduled to take place during spring break SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.