Prologis Park-DR170319
DAILY CONSTRUCTION REPORT
DATE ___03/19/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER Prologis
TEMP 72
WIND S 13
CONTRACTOR: Mycon
HUMIDITY 77
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-CalHar is adjusting manholes to prep for the next pour
-Potter will re-grade today
-Mycon will repair the damaged SWPPP
-Potter will tie rebar tomorrow
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.