Prologis Park 121 Northwest Dr--DR170418
DAILY CONSTRUCTION REPORT
DATE ___04/18/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER Prologis
TEMP 78
CONTRACTOR: Mycon
WIND S 10
HUMIDITY 56
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I informed the contractor that they could not go over 12” for spacers
-The contractor poured 4 storm drain inlets
-Pavecon still has not poured the sidewalk
-I informed Mycon that the traffic control needed to be refreshed
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.