Prologis Park 121 Northwest Dr--DR170419
DAILY CONSTRUCTION REPORT
DATE ___04/19/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER Prologis
TEMP 72
WIND S 13
CONTRACTOR: Mycon
HUMIDITY 77
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-CalHar is removing the forms off the drains that were installed
SIGNATURE
PUBLIC WORKS INSPECTOR