Prologis Park 121 Northwest Dr--DR170420 DAILY CONSTRUCTION REPORT DATE ___04/20/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER Prologis TEMP 82 CONTRACTOR: Mycon WIND S 12 HUMIDITY 59 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Pavecon is working on the sidewalk. Steel should be installed tomorrow -I informed Eric Terry that I needed densities on the sidewalk. -I informed Eric Terry that we need cylinders on each pour SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.