Loading...
Prologis Park 121 Northwest Dr--DR170421 DAILY CONSTRUCTION REPORT DATE ___04/21/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER Prologis TEMP 72 WIND S 16 CONTRACTOR: Mycon 79% HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Pavecon is grading the sidewalks on Northwest Dr. south -Pavecon is grading and forming sidewalk on Northwest Dr. North -CalHar is wrapping all of the inlets with silt material. -Pavecon plans to pour concrete on the sidewalk on Monday SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.