PA1501B-CS170421
DAILY CONSTRUCTION REPORT
DATE ___04/21/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER CITY of COPPELL
TEMP 72
WIND S. 16
CONTRACTOR: CORE
79
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
-The contractor is still working on the landscaping
East
-Miller Sierra is stripping the forms of the concrete that was poured yesterday
-Miller Sierra is forming the next section for pavement at the far east pavilion
-The contractor is still working on the center pavilion
-CORE is grading the grass areas
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.