PA1501B-CS170419
DAILY CONSTRUCTION REPORT
DATE ___04/19/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER CITY of COPPELL
TEMP 72
WIND S 13
CONTRACTOR: CORE
HUMIDITY 77
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
-The contractor is still working on the landscaping
East
-CORE is cleaning the streets
-Working on water line around the park
-I informed the plumber again that we can’t use pipe dope and Teflon on the meters
-Miller Sierra plans to pour concrete on the east pavilion and over both bridges
-I informed Miller Sierra that the mud needed to be removed prior to pouring the walking area near the pavilion
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.