PA1501B-CS170420 DAILY CONSTRUCTION REPORT DATE ___04/20/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER CITY of COPPELL TEMP 82 CONTRACTOR: CORE WIND S 12 HUMIDITY 59 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West -The contractor is still working on the landscaping East -I informed Miller Sierra that they needed to remove the soft material before they pour the concrete -Miller Sierra is pouring concrete on the sidewalk for the east pavilion -Miller Sierra is pouring concrete over both of the bridges -The plumber is still working on the plumbing around the park SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.