Loading...
Copperstone-CS 940211The City With A Beautiful Future February 11, 1994 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Dowdey, Anderson and Associates, Inc. 16250 Dallas Pkwy Suite 100 Dallas, Texas 75248 RE: Copper Stone Estates Development Fee Assessment Dear Sir:: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Copper Stone Estates. Please provide a check made payable to the City of Coppell in the amount of $123,500.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: Project: February 11, 1994 Copper Stone Estates TOTAL AMOUNT DUE ASSESSMENT PRIOR TO COUNCIL APPROVAL Water Impact Fee $84,500.00 $84,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $13,000.00 -0- (100%due at Issuance of Building Permit) Wastewater Impact Fee (MUD) $29,250.00 $29,250.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $13,000.00 -0- (100%due at Issuance of Building Permit) Utility Final Inspection Fee $6,500.00 -O- (100%due at Issuance of Building Permi0 Water Meter Fee (Lots) $2,892.50 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) -0- -0- (100% due at Issuance of Water Meters) Water Meter Deposit $3,900.00 -0- (100%due at Issuance of Building Permit) Irrigation Meter Deposit -0- -0- (100%due at Issuance of Water Meters) Street Sign Fee $2,727.55 -0- (100%due prior to Acceptance of Project) Street Light Fee * -0- (100%due prior to Acceptance of Project) Park Fee $19,500.00 $9,750.00 (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL $175,270.05 TOTAL AMOUNT DUE PRIOR TO $123,500.00 COUNCIL APPROVAL Construction Inspection Fee (2% of Project Cost due prior to preconstruction meeting) This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. FROM: RE: COPPELL PUBLIC WORKS MEMORANDUM 1993 Engineering Department Public Works Staff Development Fees for Copper Stone Estates The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 130 - 5/8" x 3/4" Domestic Meter/s = 130 ESU's Total 130 ESU's @ $650.00 ea = $ 84,500.00 100% due prior to Council approval of the final plat. Wastewater Impact (MUD) 130 - 5/8" x 3/4" Domestic Meter/s = 130 ESU's Total 130 ESU's @ $225.00 ea = $ 29,250.00 100% due prior to Council approval of final plat. Wastewater Impact (City) 0 - Domestic Meter/s = Total ESU's @ $450.00 ea = ESU's 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 130 Connections @ $100.00 each = $ 13,000.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Sewer Tap Inspection Fee 130 Connections @ $100.00 each = $ 13,000.00 100% due prior to issuance of building permit. (Residential only) Utility Final Inspection Fee (Ail Dvelopment) 130 lots @ $50.00/lot = $ 6,500.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 130 - 5/8" x 3/4" Domestic Meters @ 22.25 ea = $ 2,892.50 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 0 - Irrigation Meter/s @ $ 0 - Fireline Meter/s @ $ 100% due prior to issuance of water meter/s. ea = $ ea = $ Water Meter Deposit (Residential) 130 Meters @ $30.00 ea = $ 3,900.00 100% due prior to issuance of building permit. Note: This assessment does not include water impact, water tap, water meter, or water meter deposit fees for the irrigation meters. No sizes were available at this time for calculation. Development Fees Page 3 Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: 130 Residential Lots at $150.00 each = $ 19,500.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 4 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building Official Development Fees Page 5 STREET SIGN ASSESSMENT for Copper Stone The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 Speed Limit $63.54 27 $1,715.58 Yield $58.56 Stop $65.12 Street Name $11.60 2 23.20 Stop & Street Combo $96.85 871.65 OTHER No outlets (30") $58.56 117.12 TOTAL $2,72 7.55 DEVFEES.HLP/COPPER.HLP