Loading...
Kyra Court-CS170508 (2) Halie Hernandez From:Matthew Mabry Sent:Monday, May 08, 2017 7:45 AM To:Halie Hernandez Subject:Kyra Court FW: Walkthru - Water completed WD-INSP-05-2017-002896 Categories:This message has been archived by Retain on May 08 2017 17:45 Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov From: ITsupport@coppelltx.gov \[mailto:ITsupport@coppelltx.gov\] Sent: Monday, May 08, 2017 7:23 AM To: Debbie Taber <dtaber@coppelltx.gov>; Kori Konon <KKonon@coppelltx.gov>; Matthew Mabry <MMabry@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: Walkthru - Water completed WD-INSP-05-2017-002896 Water walkthru completed: WD-INSP-05-2017-002896 Friday, 5/5 @ 8:00 am with Matt Mabry Location: Kyra Court Note: 1. Curb cut MLV/ Blue paint curb and valve lid @ STA 0+00 2. Curb cut FHV/ Red paint curb and valve lid @ STA 0+00 3. Blue street marker for Hydrant @ STA 0+00 4. Curb cut FHV/ Red paint curb and valve lid@ STA 3+00 5. Curb Cut MLV/ Blue paint @STA 3+00 6. Curb cut FHV/ Red paint curb and valve lid @ STA 6+00 7. Raise existing valve box and pour valve pad/ Blue paint on lid @ East most tie in. 8. Curb cut BO/ Blue paint and replace lid to Blow off. 9.Blue street marker for East most hydrant on Belt Line. Jerry Davis Jason Trimmer Debi Taber 1