From:Matthew Mabry
Sent:Monday, May 08, 2017 7:45 AM
To:Halie Hernandez
Subject:Kyra Court FW: Walkthru - Water completed WD-INSP-05-2017-002896
Categories:This message has been archived by Retain on May 08 2017 17:45
Matthew Mabry
Engineering Construction Inspector
City of Coppell, TX
214-406-5223 (cell)
www.coppelltx.gov
From: ITsupport@coppelltx.gov \[mailto:ITsupport@coppelltx.gov\]
Sent: Monday, May 08, 2017 7:23 AM
To: Debbie Taber <dtaber@coppelltx.gov>; Kori Konon <KKonon@coppelltx.gov>; Matthew Mabry
<MMabry@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>
Subject: Walkthru - Water completed WD-INSP-05-2017-002896
Water walkthru completed: WD-INSP-05-2017-002896
Friday, 5/5 @ 8:00 am with Matt Mabry
Location: Kyra Court
Note: 1. Curb cut MLV/ Blue paint curb and valve lid @ STA 0+00
2. Curb cut FHV/ Red paint curb and valve lid @ STA 0+00
3. Blue street marker for Hydrant @ STA 0+00
4. Curb cut FHV/ Red paint curb and valve lid@ STA 3+00
5. Curb Cut MLV/ Blue paint @STA 3+00
6. Curb cut FHV/ Red paint curb and valve lid @ STA 6+00
7. Raise existing valve box and pour valve pad/ Blue paint on lid @ East most tie in.
8. Curb cut BO/ Blue paint and replace lid to Blow off.
9.Blue street marker for East most hydrant on Belt Line.