Loading...
Kyra Court-LR170330Rone Engineering _-lll Client: JRose Architects 2104 Cosmos Way Argyle, TX 76226 Project: Kyra Coppell, Texas Services: Perform In -Place Density Testing Contractor: Test Method: ASTM D-6938 Ambassador Row, Dallas, TX 75247 Texas Engineering Firm Registration, No. F-1572 Corporate Phone: (214) 630-9745 Report of In -Place Density TeOng PROJECT DATA Gauge: Troxler 3430 Gauge Serial No: 37656 Test Mode: DT MOISTURE DENSITY RELATIONS Report No.: 14185402 Project No.: 1520637 Date of Service: 03/30/2017 Report Date: 03/31/2017 Standard Counts " Moisture Density Current: 737 Current: 2108 Previous: 738 Previous: 2104 Maximum Moisture Density MID No. Description % (pct) 14185036 Brown / sandy lean clay with LSF 15.2 110.4 Test No 1 2 3 4 5 FIELD DENSITY TESTS Project Requirements Moisture Density -2/+4 95 Min �a Sidewalk 30' west of Beltline and Kyra Court 6" 14185036 20.6* 120.5 Sidewalk 100' east of Beltline and Kyra Court 6" 14185036 15.2 130.2 Sidewalk 180' east of Beltline and Kyra Court 6" 14185036 11.9* 127.0 An asterisk (*) appears next to results which do NOT meet the project specifications. Remarks: Sidewalk Dallas side on Beltline west bound from Kyra Court. Technician: Dustin Harvey Started: 06:30am Finished: 10:15am Rone Engineering Report Distribution: Orig: JRose Architects (Argyle, TX) Attn: Mr. Jason Rose (1-ec copy) 1-ec Rone Engineering Project Managers Attn: Mr. Scott Watson, CET 99.9 91 1__. 113.0 102 113.5 103 b K. Scott Watson, CET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in qu' (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (PH/SW) Page 1 of 1 b'� Probe MID Moisture Wet Density Dry Density Density Test Location Depth No. % ( (pcf) % max Sidewalk 220' west centerline of Kyra Court and Beltline 6" 14185036 19.6* 108.1 90.4 b':;$2* Sidewalk 120' west of Beltline and Kvra Court 6" 14185036 18.3 122.4 103.5 94* Sidewalk 30' west of Beltline and Kyra Court 6" 14185036 20.6* 120.5 Sidewalk 100' east of Beltline and Kyra Court 6" 14185036 15.2 130.2 Sidewalk 180' east of Beltline and Kyra Court 6" 14185036 11.9* 127.0 An asterisk (*) appears next to results which do NOT meet the project specifications. Remarks: Sidewalk Dallas side on Beltline west bound from Kyra Court. Technician: Dustin Harvey Started: 06:30am Finished: 10:15am Rone Engineering Report Distribution: Orig: JRose Architects (Argyle, TX) Attn: Mr. Jason Rose (1-ec copy) 1-ec Rone Engineering Project Managers Attn: Mr. Scott Watson, CET 99.9 91 1__. 113.0 102 113.5 103 b K. Scott Watson, CET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in qu' (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (PH/SW) Page 1 of 1 b'� Rone Engineering 0 8908 Ambassador Row, Dallas, TQC 75247 Texas Engineering Firm Registration, No. F-1572 Corporate Phone: (214) 630-9745 Report of In -Place Density Te§dng Client: JRose Architects Report No.: 14185343 2104 Cosmos Way Project No.: 1520637 Argyle, TX 76226 Date of Service: 03/30/2017 Report Date: 03/31/2017 y� Project: Kyra Coppell, Texas Services: Perform In -Place Density Testing PROJECT DATA Contractor: Standard Counts y Test Method: ASTM D-6938 Gauge: Troxler 3430 Moisture Density Gauge Serial No: 37656 Current: 737 Current: 2108 Test Mode: DT Previous: 738 Previous: 2104 MOISTURE DENSITY RELATIONS Maximum Moisture Density Project Requirements M/D No. Description % (pcf) Moisture Density 14185036 Brown / sandy lean clay with LSF 15.2 110.4 Optimum +4 95 Min 11� Test tin Test Location FIELD DENSITY TESTS Probe M/D Moisture Wet Density Dry Density Density Depth No. % (pcf) (pcf) % max Sidewalk 1 35' north, 25' east of centerline 6" 14185036 11.4* 111.2 99.8 �.::Zp0* Sidewalk 2 25' north, 30' west of centerline 6" 14185036 14.5* 130.5 114.0 103 Sidewalk 3 80' west, 45' north of the centerline 6" 14185036 17.5 123.7 105.3 95 An asterisk (*) appears next to results which do NOT meet the project specifications. Remarks: Sidewalk City of Coppell side. Technician: Dustin Harvey Rone Engineering See Report 14185402 for technician time Report Distribution: Orig: JRose Architects (Argyle, TX) Attn: Mr. Jason Rose (1-ec copy) 1-ec Rone Engineering Project Managers K. Scott Watson, CET Attn: Mr. Scott Watson, CET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality,, (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reportsZr`e for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (PH/SW) Page 1 of 1