Halie Hernandez
From:Matthew Mabry
Sent:Wednesday, May 10, 2017 8:24 AM
To:Halie Hernandez
Subject:Kyra court streets walkthru FW: Completed - Walkthru ST-PM-05-2017-002897
Matthew Mabry
Engineering Construction Inspector
City of Coppell, TX
214-406-5223 (cell)
www.coppelltx.gov
From: ITsupport@coppelltx.gov \[mailto:ITsupport@coppelltx.gov\]
Sent: Tuesday, May 09, 2017 3:04 PM
To: Debbie Taber <dtaber@coppelltx.gov>; Kori Konon <KKonon@coppelltx.gov>; Matthew Mabry
<MMabry@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>
Subject: Completed - Walkthru ST-PM-05-2017-002897
Walkthru Inspection: ST-PM-05-2017-002897
Location: Kyra Court
Note: (1) Storm box needs cleaning of debris. Replace turn over lid.
Note: (2) Route and seal both inlet cracks on each side marked with paint.
Note: (3) Remove two steel forms at the approach of entrance
Note: (4) Re-grout chipped curb by the entrance approach
Note: (5) Storm drain by the wall next to the sidewalk needs to be addressed by removing dirt and rocks on and
around the storm drain. silk fence around storm drain needs to be straightened and regrade around it.
Note: (6) Remove steel and debris left behind as well.
Friday 5/5 @ 8:00 am with Matt Mabry
Roy Cardoza
Matt Mabry