Loading...
Kyra Court-CS170509 Halie Hernandez From:Matthew Mabry Sent:Wednesday, May 10, 2017 8:24 AM To:Halie Hernandez Subject:Kyra court streets walkthru FW: Completed - Walkthru ST-PM-05-2017-002897 Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov From: ITsupport@coppelltx.gov \[mailto:ITsupport@coppelltx.gov\] Sent: Tuesday, May 09, 2017 3:04 PM To: Debbie Taber <dtaber@coppelltx.gov>; Kori Konon <KKonon@coppelltx.gov>; Matthew Mabry <MMabry@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: Completed - Walkthru ST-PM-05-2017-002897 Walkthru Inspection: ST-PM-05-2017-002897 Location: Kyra Court Note: (1) Storm box needs cleaning of debris. Replace turn over lid. Note: (2) Route and seal both inlet cracks on each side marked with paint. Note: (3) Remove two steel forms at the approach of entrance Note: (4) Re-grout chipped curb by the entrance approach Note: (5) Storm drain by the wall next to the sidewalk needs to be addressed by removing dirt and rocks on and around the storm drain. silk fence around storm drain needs to be straightened and regrade around it. Note: (6) Remove steel and debris left behind as well. Friday 5/5 @ 8:00 am with Matt Mabry Roy Cardoza Matt Mabry 1