CRDC1401-DR170501
DAILY CONSTRUCTION REPORT
DATE ___05/01/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Sunny
OWNER CITY of COPPELL
TEMP 84
WIND WSW 6
CONTRACTOR: Pavecon
HUMIDITY 21
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Mike B. from Pavecon spoke with the owner from 123 E Sandy Lake about the irrigator on Friday
-Mike will have a meeting with the contractor today to figure out what the problem is with the landscaping
-Pause is onsite to fill the holes from the ONCORE
-AALC will start work soon on the landscaping
-Pause will give the electrical meter box to the Traffic Department
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.