CRDC1401-DR170501 DAILY CONSTRUCTION REPORT DATE ___05/01/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Sunny OWNER CITY of COPPELL TEMP 84 WIND WSW 6 CONTRACTOR: Pavecon HUMIDITY 21 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Mike B. from Pavecon spoke with the owner from 123 E Sandy Lake about the irrigator on Friday -Mike will have a meeting with the contractor today to figure out what the problem is with the landscaping -Pause is onsite to fill the holes from the ONCORE -AALC will start work soon on the landscaping -Pause will give the electrical meter box to the Traffic Department SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.