CRDC1401-DR170427
DAILY CONSTRUCTION REPORT
DATE ___04/27/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Sunny
OWNER CITY of COPPELL
TEMP 73
WIND SE 19
CONTRACTOR: Pavecon
40
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-No resolution has been made on the irrigation
-Frontier and alliance have not came to a conclusion on the payment
-No work has been done on the change order items
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.