CRDC1401-DR170428
DAILY CONSTRUCTION REPORT
DATE ___04/28/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER CITY of COPPELL
TEMP 74
WIND S 11
CONTRACTOR: Pavecon
73
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Mike will speak with the residents at 123 Sandy Lake owners today after the meeting
-Monday, Pause will fill in the holes left be ONCORE
th
-On the 8, AAIC will start work on the change order items
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.