Loading...
CRDC1401-DR170425 DAILY CONSTRUCTION REPORT DATE ___04/25/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Party Cloudy OWNER CITY of COPPELL TEMP 83 CONTRACTOR: Pavecon WIND S. 24 HUMIDITY 60 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -ATCI is working why the lights on Sandy Lake will not go off -Pause is onsite and they are backfilling the open holes -Pause will be removing the box and the meter box in front of Frost Bank SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.