Loading...
CRDC1401-DR170426 DAILY CONSTRUCTION REPORT DATE ___04/26/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Overcast OWNER CITY of COPPELL TEMP 63 WIND NW 24 CONTRACTOR: Pavecon HUMIDITY 78 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -I spoke to Michael B. from Pavecon about the 123 Sandy Lake -Michael plans to speak with the owner about the irrigation -Michael will have the owner turn on the irrigation SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.