CRDC1401-DR170426
DAILY CONSTRUCTION REPORT
DATE ___04/26/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Overcast
OWNER CITY of COPPELL
TEMP 63
WIND NW 24
CONTRACTOR: Pavecon
HUMIDITY 78
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-I spoke to Michael B. from Pavecon about the 123 Sandy Lake
-Michael plans to speak with the owner about the irrigation
-Michael will have the owner turn on the irrigation
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.