Loading...
Prologis Park-DR170326 DAILY CONSTRUCTION REPORT DATE ___03/26/2017_12:30pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Overcast OWNER Prologis TEMP 63 WIND NW 24 CONTRACTOR: Mycon HUMIDITY 78 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Mycon is grading the far east side of the property -All of the erosion control on the east side of the property has been repaired -Mycon is still working on the exterior and the interior of the property -Mycon is still pouring pavement in between the floor and the wall. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.