DAILY CONSTRUCTION REPORT
DATE ___03/26/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER Prologis
TEMP 83
CONTRACTOR: Mycon
WIND SSE 16
60%
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Potter is pouring concrete on the far east side of the property
-Mycon is still working on the interior of the building
-I inspected the steel again and Potter made all of the corrections that I need done
SIGNATURE
PUBLIC WORKS INSPECTOR