Freeport NIP(2.3)-LR 960930 (3)F/~E~'r-~ / I~ I--IC~ I I--I E: I~ I~III-'IC~
GEOTECHNICAL AND G J~J ~1 I I F~
ENVIJ~ONHENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Coppell Mill Limited Partnership Distribution Center
Royal Lane at Gateview Boulevard
Coppell, Texas
REPORTED TO:
CONTRACTOR:
Coppell Mill Limited Partnership
100 Schelter Road
Lincolnshire, Illinois 60069-3621
ATTN: Mr. Terry Schwarting
Raymond Construction Company, Inc.
REPORT NO. 47
REPORT DATE: 09-30-96
REG PROJECT NO. 2665.2
DATE OBSERVED: 10-02-96
TECHNICIAN: B. Ray
Paving - at northwest building corner (west of dock ramp) miscellaneous sidewalks (west end
parking area).
Civil Plans
These deviations were corrected __ not corrected
X No deviations were observed. All reinforcing steel appeared
to be placed in accordance with contract documents & CRSI.
Distribution:
(1) Coppell Mill Limited Parnership/
Mr. Terry Schwarting
(1) Mayse & Associates/
Mr. Mike Mayse
(1) Raymond Construction Co., Inc./
M~r. Charles Raymond
(~ity of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
RFPJysh
2424 STUTZ DP,. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019