Prologis Park-DR170501 DAILY CONSTRUCTION REPORT DATE ___05/01/2017_12:30pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Sunny OWNER Prologis TEMP 77 WIND SSW 10 CONTRACTOR: Mycon HUMIDITY 27 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -No work is being done on the pavement area -Construction is still being done on the interior and the exterior of the project -7:00am, the rest of the pouring on the fire lane will be pour -The contractor informed me that there is a leaking double check south of the property SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.