Prologis Park-DR170502 (2)
DAILY CONSTRUCTION REPORT
DATE ___05/02/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER Prologis
TEMP 74
WIND SSW 8
CONTRACTOR: Mycon
HUMIDITY 91
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-West of the building is still being graded for the next pour
-Potter is also working on the north side of the property
-Contractor is still working on the interior of the project
-leave-outs and sprinklers are being installed
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.