Loading...
Prologis Park-DR170502 (2) DAILY CONSTRUCTION REPORT DATE ___05/02/2017_12:30pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER Prologis TEMP 74 WIND SSW 8 CONTRACTOR: Mycon HUMIDITY 91 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -West of the building is still being graded for the next pour -Potter is also working on the north side of the property -Contractor is still working on the interior of the project -leave-outs and sprinklers are being installed SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.