Prologis Park-DR170509
DAILY CONSTRUCTION REPORT
DATE ___05/09/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER Prologis
TEMP 82
WIND SSE 10
CONTRACTOR: Mycon
HUMIDITY 57
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Mycon is still grading the east side of the property
-Concrete is being pour between the walls and the floor of the building
-I will perform a rebar inspection tomorrow depending on the weather
SIGNATURE
PUBLIC WORKS INSPECTOR