Freeport NIP(2.3)-LR 960930 (2)GEOTECHNICAL AND J~ F~J J~ L.J ~
ENVIRONHENTAL CONSULTANTS
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Coppell Mill Limited Partnership Distribution Center
Royal Lane at Gateview Boulevard
Coppell, Texas
REPORTED TO:
Coppell Mill Limited Partnership
100 Schelter Road
Lincolnshire, Illinois 60069-3621
ATTN: Mr. Terry Schwarting
REPORT NO. 34
REPORT DATE: 09-30-96
REG PROJECT NO. 2665.2
DATE OBSERVED: 08-22-96
TECHNICIAN: B. Steadman
CONTRACTOR: Raymond Construction Company, Inc.
1. Slab - leave out from grid line A.2-5.1 through A.2-15.9 going counter clockwise.
2. Dock leveler floor from grid line A-7 through A-15.5
3. Warehouse office slab from grid line A-10.5 to A-11.5 to A..7-10.5
Sheet S2.0 and S3.0
These deviations were corrected __ not corrected
~ No deviations were observed. All reinforcing steel appeared
to be placed in accordance with contract documents & CRSl.
Distribution:
(1) Coppell Mill Limited Partnership/
Mr. Terry Schwarting
(1) Mayse & Associates/
Mr. Mike Mayse
(1) Raymond Construction Co., Inc./
Mr. Charles Raymond
Submitted by:
REED ENGINEERING GROUP, INC.
Original Signed By
Ronald F. Reed, P.E.
RFPJmsm