Loading...
Freeport NIP(2.3)-LR 960930 (2)GEOTECHNICAL AND J~ F~J J~ L.J ~ ENVIRONHENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Coppell Mill Limited Partnership Distribution Center Royal Lane at Gateview Boulevard Coppell, Texas REPORTED TO: Coppell Mill Limited Partnership 100 Schelter Road Lincolnshire, Illinois 60069-3621 ATTN: Mr. Terry Schwarting REPORT NO. 34 REPORT DATE: 09-30-96 REG PROJECT NO. 2665.2 DATE OBSERVED: 08-22-96 TECHNICIAN: B. Steadman CONTRACTOR: Raymond Construction Company, Inc. 1. Slab - leave out from grid line A.2-5.1 through A.2-15.9 going counter clockwise. 2. Dock leveler floor from grid line A-7 through A-15.5 3. Warehouse office slab from grid line A-10.5 to A-11.5 to A..7-10.5 Sheet S2.0 and S3.0 These deviations were corrected __ not corrected ~ No deviations were observed. All reinforcing steel appeared to be placed in accordance with contract documents & CRSl. Distribution: (1) Coppell Mill Limited Partnership/ Mr. Terry Schwarting (1) Mayse & Associates/ Mr. Mike Mayse (1) Raymond Construction Co., Inc./ Mr. Charles Raymond Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. RFPJmsm 2424 STUTZ DP,. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019