Prologis Park-DR170510
DAILY CONSTRUCTION REPORT
DATE ___05/10/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER Prologis
TEMP 73
WIND SE 13
CONTRACTOR: Mycon
HUMIDITY 81%
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-The contractor is still grading
-I performed a rebar inspection this afternoon. I informed the contractor that the loose debris needed to be removed and the rocks needed to be
taken out
-Mycon is not responsible for the broken water line
SIGNATURE
PUBLIC WORKS INSPECTOR